Cases

SVG application with photovoltaic power station
SVG application with photovoltaic power station
Site:Energy storage photovoltaic power plant in Chad, Africa Load:Photovoltaic power plant The project is equipped with 30MW photovoltaic power, which will further relieve the local power pressure and greatly improve t
The world's largest single PV project successfully connected to the grid
The world's largest single PV project successfully connected to the grid
The world's largest single photovoltaic project successfully connected to the grid in Midong,Xinjiang. The project is located in the northern desert of Midong District,Urumqi, covering an area of 15000 hectare,wit
VFD application with Kiln Fan
VFD application with Kiln Fan
End User : Tasek Corporation Bhd.  1st order for cement plant; approx. MYR 2’0 million Modernization of Drive System and Motor for Kiln ID Fan 1 x 3.1MW, 6000V, Perfect Harmony + Motor Replace old current
VFD application with Pumping Station
VFD application with Pumping Station
End User : State Government water board Project : Ranchang Water Treatment Plant 2 x 600KW Competition : ABB ACS1000 with strong preference and system prefer with external isolating x-mer from Trasfo, Thailand SMHB co
VFD application with Southern Steel Main Fan
VFD application with Southern Steel Main Fan
End User : Southern Steel Bhd, Penang Project : Upgrading Main IF Fan No.1 & 2 Drive System for improve their capacity & achieving of energy saving by 50%,The final result >65%, 0.96PF energy saving 2 x 710
High voltage Frequency converter Application with internal mixer machine
High voltage Frequency converter Application with internal mixer machine
Jiangsu Runchang Rubber Technology is a specialized company dedicated to all-steel radial truck tire. The company has completed Phase I project and has an annual production capacity of 600000 sets of TBR. After Phas
SVG application with wind farm
SVG application with wind farm
Model : FGSVG-C18.0/6.3-O-W-T No.:HS41Q1411G31 The project is located in Lucky Cement Limited, Karachi, Pakistan, and is a second phase II wind power project. It is planned to install 64.8MW fans, and one 18M/6.3kV SVG
SVG application with smelting furnace
SVG application with smelting furnace
A SVG equipment has been successfully put into operation in WEL MINING Smelting Company of Zimbabwe. Our company has continuously put four equipment into operation on the site. At present, all the equipment is in stable
SVG application with Substation Project
SVG application with Substation Project
Nation:Serbia Project: Serbia Copper and Gold Mine Substation Project Model:FGSVG-C10.0/10 Equipment capacity: 10kV10Mvar indoor air cooling Load: substation Heat dissipation: air cooling